TABLE OF CONTENTS





THE SEAM Project - An Introducation[ PDF: 148 Kb | 8 Page ]
Factories Participating in the Water and Energy Conservation Demonstration Project

Part A[ PDF: 95.4 Kb | 4 Page ]
1. General Overview
     1.1 Importance of Water Conservation
     1.2 Water Use in Egypt
     1.3  Importance of Energy Conservation
     1.4  Energy Use in Egypt
2.   Introducation to the Guidance Manual

Part B - Combining  Preparatory Process - AStep -by - Step Guide[ PDF: 167 Kb | 22 Page ]
Step 1:     Management Commitment
Step 2:     Establish a Factory Water and Energy Conservation Team
Step 3:     Conduct a Water Audit
Step 4:     Identify Water Saving Opportunities
Step 5:     Evaluate Expected Water Saving
Step 6:     Conduct an Energy Audit
Step 7:     Identify Energy Saving Opportunities
Step 8:     Evaluate Saving expected from Implementations
Step 9:     Prepare a Monitoring Plan for Assessment
Step 10:   Implementing Water Saving Opportunities
Step 11:   Implementing Energy Saving Opportunities
Step 12:   Implementing the Monitoring and Maintenance Plan for follow-up

Part C - Costs and Benefits[ PDF: 102 Kb | 5 Page ]
1.    Cost/Benefit Analysis
2.    Costs and Benefits at Edfina Factory
3.    Costs and Benefits at Kaha Factory

Part D - Helpful Hints[ PDF: 93.2 Kb | 3 Page ]
Do's and Don'ts
References

Appendices[ PDF: 1.65MB | 18 Page ]
1. Staem Leak Rates through Holes
2. Heat Losses from Bare and Insulated Steam Pipes
3. Fuel Saving from Condensate Return
4. Calorific Values of Energy Sources
5. Steam Table