Projects are classified below according to their progress.

Egyptian Pollution Abatement Project (EPAP)

World Bank

The estimated pipeline project costs until Mar. 2003

Company

Project

Status

Project Cost MUS$

Companies signed sub-loans

Abu Kir Fertilizers Co.

Reduction of nitrogen oxides stack in emissions from the Nitric Acid Plant

Completed

0.997

Neeasae

Conversion of TL and TLD Production lines from Mercury Dosing to Argon Flushing

Completed

0.201

Transport & Engineering Co.

Conversion of the manual tire spraying process to automatic process

Completed

0.375

Goldentex Co.

Installation of IWWTP

Completed

0.14

Egyptian Plastic & Electric co.

Collection System for the acid fugitive vapor and vapor fumes treatment in the formation yard in the battery factory

Commissioning

0.955

Misr Aluminum

Fume treatment – Dry process

Under installation

4.9

Cairo Poultry – Koki

Installation of IWWTP

Completed

1.21

Egyptian Salts & Minerals Co.- Emisal

Washing and distillation of Sodium Chloride salt

Completed

3.044

Delta Fertilizers & Chemical Industries (Stripper)

Replacement of high pressure stripper and condenser in the urea unit B

Completed

1.038

Delta Fertilizers & Chemical Industries  (Condenser)

 

Under installation

1

El Nasr Fertilizers & Chemicals (Semadco)

Completion of the wet scrubbing recovery unit & recycling of ammonium nitrate dumped product

Completed

0.478

Tanta for Oil & Soap

Reduction of hexane emissions in oil extraction unit by installation of a new toaster unit

Commissioning

0.2

General company for Ceramics & Porcelain Products – Chini

Installation of new sanitary furnace working with NG instead of two working with solar

Under installation

0.675

Kafr El Zayat for Pesticides

Improving the work environment inside the factory (replacing bottling line, and installing de-dusting unit in agricultural sulfur unit

LC

1

Sub total

   

16.213

 

Sub-projects (under contracting)

Arma fro food industries

Replacement of the bleaching unit by new one and rehabilitation of the cooling

Contracting

2.34

Suez Cement

Upgrading of electrostatic precipitators and conditioning towers in kiln.

Contracting

4.9

Sub total

   

7.24

 

Sub-project (under evaluation)

Tanta for Oil & Soap (Project two)

Rehabilitation of the animal feed mill production unit and installation of ventilation unit.

Evaluation

0.3

Alexandria for Sodium Carbonate Co.

Replacement two sodium carbonate kiln with one fired kiln with it facilities.

Evaluation

4.2

Egyptian Petrochemicals Co.

installation of new sulfuric acid concentration unit.

Tendering

0.6

Sub total

   

5.10

 

Sup-project (under tendering)

Al Ahram Beverage

Industrial wastewater treatment plant & In-plant modifications

Tendering

1.7

Alfa Ceramics

Dust Abatement Project

Asking for quotation

0.165

Sup total

   

1.865

       

TOTAL

   

30.418

Remaining Amount (total 34.56)

   

4.142

 

 

 

 

 